港澳台图库

On the required periodic schedule, 港澳台图库 will conduct the following services as required by the Texas Pollution Discharge Elimination System (TPDES) 鈥 Multi-Sector General Permit (MSGP):

  • Quarterly Site Inspections – Each site is inspected quarterly by a 港澳台图库 representative and the results of the inspection are documented on a 港澳台图库 Quarterly Site Inspection checklist. A copy of the completed checklist is provided to the facility representative for inclusion in the Stormwater Pollution Prevention Plan (SWPPP) and 港澳台图库 will retain a copy for its files and records.
  • Quarterly Visual Analysis – Site personnel will collect the stormwater samples either manually or utilizing the Thermo Fisher stormwater sampler and ship the sample to 港澳台图库 for visual and chemical analysis as required. Results of the visual analysis will be provided to the site representative for inclusion in the SWPPP and a copy retained by 港澳台图库.
  • Numeric Effluent Limitation (NEL) Sampling/Reporting – NEL reporting via Discharge Monitoring Reports (DMRs) may not be required based on the filing of Hazardous Metals Waivers; otherwise, samples will be analyzed for the NEL parameters and DMRs prepared as required.
  • Benchmark Monitoring – Benchmark Monitoring is required semi-annually for specified facilities. If required, the sample will be collected and provided to 港澳台图库 for the Quarterly Visual Analysis and then used for Benchmark analysis as well. 港澳台图库 will submit the sample to an approved laboratory for analysis. Results of the chemical analysis will be provided to the site representative with an evaluation of the results against the Benchmark parameters and a recommendation for a benchmark exceedance investigation will be provided in the event of a parameter exceedance.
  • Benchmark Reporting – For those sites that require Benchmark monitoring, 港澳台图库 will complete the Benchmark Monitoring Reports on the TCEQ provided forms. These reports will be provided to the facility for review, signature and submission to the TCEQ prior to the March 31 deadline the following year.
  • Annual SWPPP and Spill Prevention Control Training – 港澳台图库 will, during one of the quarterly inspections, conduct the required Annual SWPPP and SPCC training. Each session will last from 45 to 60 minutes depending on questions and delivery. Copies of the training material and sign-in sheets will be provided to the site representative for inclusion in the SWPPP binder, and a copy will be maintained by 港澳台图库.
  • Annual Comprehensive Compliance Evaluation – In lieu of one of the quarterly inspections, the Annual Comprehensive Compliance Evaluation (ACCE) will be completed for each facility as required by the TPDES permit. The final ACCE will be provided to the facility representative for inclusion in the SWPPP and 港澳台图库 will retain a copy for the file.
This solution has been used in these market sectors